
Valley Park, MO – Say hello to 44 East, the newest mixed-use luxury apartment community making waves at 2075 Smizer Station Road & 1911 Valley Park Road—yes, the former site of St. Louis’ legendary Wet Willies water slide!
This new development by Mia Rose Holdings, LLC, in collaboration with the creative minds at Rosemann & Associates, P.C., introduces a new lifestyle with nostalgic charm, upscale comforts, smart design, and sweeping views of Valley Park, MO!
Project Highlights
- Location: Valley Park, MO (St. Louis County + City of Valley Park)
- Size: ±16.08 acres
- Buildings: 13 total
- 7 three-story residential buildings
- 1 one-story community clubhouse
- Convenient garages
- Units: 216 total
- 108 one-bedroom / one-bath
- 96 two-bedroom / two-bath
- 12 three-bedroom / two-bath
- Square Footage: ±222,515 GSF (including garages & clubhouse)
- Unit Sizes: ±751 to 1,274 square feet
Design & Amenities
44 East brings luxury living to the heart of Valley Park with stylish design elements such as Hardie panel and lap siding, masonry veneer accents, decorative metal railings, modern exterior lighting, architectural shingles, detached garages for resident convenience, a resort-style swimming pool, and a beautifully designed clubhouse.
44 East Stands Out
Beyond its upscale finishes and scenic views, 44 East is being built on a site with local nostalgia and character. Longtime St. Louisans will remember this location as the home of Wet Willies, a once-popular water slide attraction. Now, this landmark location will take on a new life, providing high-quality housing to meet the growing demand in the Valley Park area.
The development also benefits from close collaboration with city and county building officials and has involved significant site coordination to bring the vision to life.
Project Team
- Owner/Developer: Mia Rose Holdings, LLC (44 East Luxury Living, LLC)
- Architect: Rosemann & Associates, P.C.
- Katie Mueller, Drew Jablonski, Ryan Montana, Jarrett Cooper, Juan Escobar
- Structural Engineer: IMEG | Chad Schrand
- General Contractor: MBG | Chris Shinkle
- MEP: The Engenuity | Amanda Buchheit & Marcus Eckstien
- Civil Engineer: Sterling Engineering | Brian Jokerst
This exciting development will be a head-turner when it wraps up in the Summer of 2027. Stay tuned for more updates.
